The technological wastewater treatment plant from the dairy industry was delivered in 2016., with a capacity of 50 m3/day. The device is designed according to the obtained project task for the development of the conceptual design. In addition to milk processing, the dairy also produces many dairy products, and technological wastewater is generated from the production process and needs to be treated before being discharged into the public sewer system.
Technological wastewater consists of:
- wastewater from the dairy plant (wastewater without whey)
- wastewater from washing raw milk supply tanks
- wastewater from washing trucks for transporting dairy products
Before designing the technological wastewater treatment plant, the water analysis was performed, which is shown in Table 5.