The device for batch wastewater treatment of technological wastewater that arises from the process of making complex steel structures from fine-grained steel was delivered in 2019.
Wastewater is treated by physico-chemical process. Separation of sludge takes place in a settling tank based on the gravitational deposition of solids and particles whose density is higher than density of water. After settling, sludge is formed whis is further transferred to a sludge tank and to a dehydration system.
The device is located in a steel container together with an electrical control cabinet that automatically controls the operation of the entire device and is equipped with an audible and visual alarm.



