The device was delivered in 2018., with a capacity of 5 m3/day for the treatment of technological wastewater generated from the process of washing stainless steel tanks after finishing with various chemicals. The required output parameters that are achieved are shown in the Table. 11 and satisfy the discharge of water into the public drainage system.



