The device for batch purification of technological wastewater that arises from the process of making complex steel structures from fine-grained steel was delivered in 2019. and has a capacity of 1 m3/day.
At the location of the delivered WWTP, the maximum amount of wastewater is 5,000 l/day.
An analysis of wastewater was made and according to the obtained parameters, the device was designed to meet the prescribed regulations for discharge into the public sewer system.



