• Albanian
  • English
Mediation, design, consulting and research in the field of wastewater and air treatment ATT&AT d.o.o.
BP GROUP d.o.o.BP GROUP d.o.o.BP GROUP d.o.o.BP GROUP d.o.o.
  • PRODUCTS
    • Production program 1
      • Swimming Pools and Pool Technique
      • Light Liquids Separators
      • Waterproof Collecting Tanks
      • Wastewater Treatment Plants
      • Tele-Supervising Control
      • UV Disinfection and Chemical Treatment
      • Composting
      • Polyelectrolyte preparation unit
    • Production program 2
      • Securing Devices
      • Drainage Channels
      • Manholes
      • Nidaplast
      • Rain Water Collecting Plants
      • Carwash Stations
    • Production program 3
      • Tanks
      • Pontoons
      • Pontoon house
      • Lagoons
      • Air Treatment
      • Treatment of Industrial Water
      • Filter Bags
  • PROJECTS
    • Treatment of Industrial Water
      • Fish industry – plant for processing sea fish
      • Dairy industry – milk processing plant
  • NEWS
  • TECHNICAL SUPPORT
    • QUUESTIONNAIRES
    • REFERENCE LIST
  • ABOUT US
  • CONTACT

Aerobic Anaerobic Devices

  • Aerobic Anaerobic Devices
    • BP ASP K O/SN 3-25 PE
    • BP ASP K O/AB 3-25 PE
    • BP ASP N 30-150 PE
    • BP ASP 300-600 PE
    • BP ASP 500-800 PE
    • BP ASP 500-5000 B
  • FBR Devices
    • BP FBR P 51-300 PE
    • BP FBR P 350-1000 PE
  • Microfiltration
    • BP ASP K ULTRA O/SN 3-25 PE
    • BP ASP K ULTRA O/AB 3-25 PE
    • BP ASP N ULTRA 3-150 PE
  • Embedding and Maintance
  • SBR Plants
    • BP SBR O/SN 4-40 PE
    • BP SBR O/AB 4-40 PE
    • BP SBR P 4-250 PE
    • BP SBR 300–500 PE
    • BP SBR 600–1000 PE
Home Wastewater Treatment Plants Aerobic Anaerobic Devices

Biological WWT type “BP ASP” is made in the form of a container, so it can be easily embedded, and can be implemented into bigger wastewater treatment plants. The outside and the partitions walls are made from wall elements and polypropylene sheets. Machine-technological equipment of WWTP consists of:
• a source of pressed air (blowers)
• fine-bubble aeration system
• electrical switch board
The dimensions of the biological WWT plant are in accordance with the European norm EN 12566-3 and 12255. For one population equivalent (PE) the estimated amount of wastewater is 150 l per day and the BOD5 is 60g per day. The guaranteed outlet values are:
• BOD5 25 mg/l,
• COD 100 mg/l and
• SS 25 mg.

Partition

BP ASP K (3-25 PE) – is a biological wastewater treatment plant used for the treating of domestic wastewater of family houses, small companies, and hotels with up to 25 PE. For one population equivalent (PE) the estimated amount of wastewater is 150 l per day and the BOD5 is 60g per day, which is in conformity with the European norm EN 12566-3 and 12255. Guaranteed outlet values are BOD5 25 mg/l, COD 120 mg/l.
BP ASP N (25-170 PE) – is a biological wastewater treatment plant used for treating the communal wastewaters for: hotels, small villages, factories with the capacity of up to 1,000 PE., etc. It is made in the form of a container, so it is easy for embedding and can be implemented into bigger wastewater treatment plants.
For one population equivalent (PE) the estimated amount of wastewater is 150 l per day and the BOD5 is 60g per day, which is in conformity with the European norm EN 12566-3 and 12255.Guaranteed outlet values are BOD5 25 mg/l, COD 100 mg/l, SS 25 mg.
BP ASP N/pump (25-170 PE) – it is used when the incoming sewage system is too deep so it is more economical to bring the wastewater closer to the ground level.

Description of the tehnology

The sediments and light-weight elements are retained in the cleaning area (A). The mechanically purified water flows into the activation area (B), which can be equipped with a biomass carrier. The organic matter is transformed by activation.
The parameters allow the necessary conditions for nitrification. The sedimentation of the biological sludge (which is returned to the activation area) takes place in the cleaning tank (D). The device’s outlet is regulated by the mammoth pump (F). All the superfluous sludge is automatically discharged, at regular intervals, from the activation area into the discharge area.

Maintance Operation

LIST OF MAINTENANCE OPERATIONS

The plant is designed so as not to require constant monitoring. Once on, it is necessary from time to time to carry out checks and operations described below.

Visual check

The regular visual check is a primary condition for successful working of the plant. After opening the lid check:

      • the function of aerating
      • effluent trough and pipe
      • connecting hole
      • overall situation

Check of the volume of activated sludge and taking of samples
The volume of sludge in the activation zone must be checked as follows:

  • by using a ladle on a stick take water from the activation tank and pour it into Inhofe cone of the 1-liter graduated cylinder
  • the filled Imhoff cone (or graduated cylinder), usually a 1-liter cylinder, with water and sludge must be put on a leveled surface and let to set for 30 minutes.
  • observe at which height a distinct border between water and sludge settled on the bottom appears.

Extraction of excess sludge The sludge is extracted using a cesspool vehicle by inserting a suction basket into the bottom of the sludge zone. The sludge zone is accessible after opening (removing) of the smell-tight lid. To ensure proper sludge extraction from the sludge zone it is necessary to break the top, usually grease cake, using the reverse run of the cesspool vehicle and mixing the volume of the sludge zone and then extract the sludge to the cesspool vehicle.

  • Switch off the blower before inserting the suction basket.
  • Insert the suction basket to the sludge zone carefully so as not to harm the bottom of the tank or the technical partition walls.
  • Ask the operators of the cesspool vehicle to break the cake and mix the content of the sludge zone using reverse run.
  • Fill the sludge zone with clean water right after sludge extraction (e.g. by opening a tap in the connected building) and switch on the blower.
  • Do not empty the other zones of the plant tank except for the sludge zone.

On your request, we can offer you WWTP, with the capacity from 1000 – 5000 PE.

Leave a Comment

Cancel reply

Your email address will not be published. Required fields are marked *

PRODUCTS

  • Swimming Pools and Pool Technique
  • Waterproof Collecting Tanks
  • Wastewater Treatment Plants
  • Tele-Supervising Control
  • UV Disinfection and Chemical Treatment
  • Composting
  • Securing Devices
  • Manholes
  • Drainage Channels
  • Rain Water Collecting Plants
  • Filter Bags
  • Tanks
  • Pontoons
  • Pontoon house
  • Lagoons
  • Air Treatment
  • Treatment of Industrial Water
  • Polyelectrolyte preparation unit
  • Carwash Stations

Borplastika Eko sh.p.k.

Rr. Kodra e Diellit. Nr. 3
Selitë, Farkë, Tirana 1001-1054

E-Mail: office@borplastikaeko.al

Mob: +355 69 392 2388

*** BP Group nuk mban përgjegjësi për ndonjë gabim të mundshëm në tekst

Privacy Policy

PARTNERË PËR DIZAJNIN 3D


W3Schools

BP GROUP

CROATIA

BP GROUP d.o.o.
Glavna 2, Kneževi Vinogradi
Tel: +385 31/730-881
E-mail: bp-group@bp-group.hr

SERBIA

Borplastikaeko d.o.o.
Čerevićka 46D/2, Novi Sad
Tel: +381 21/6312-299
E-Mail: office@borplastikaeko.rs

BOSNIA AND HERZEGOVINA

Borplastikaeko d.o.o.
Kralja Tvrtka Prvog br. 2, Tuzla
Tel: +387 35/279-122
E-Mail: office@borplastikaeko.ba

MONTENEGRO

Borplastikaeko d.o.o.
Kozaračka 21a, 81000, Podgorica
Tel: +382 20/240 780
E-Mail: direktor@borplastikaeko.me

NEW ZEALAND

111 View Rd | Sunnyvale
Auckland 0612
Tel : +64 21/1931-777
E-Mail: info@bor-plastika.co.nz

HUNGARY

Bolygó utca 18, Pécs
Tel: +36 72/891-363
E-mail: office@bor-plastika.eu

MACEDONIA

EHI dooel
3 Makedonska brigada bb , Skopje
Tel : +389 22/460-075
E-Mail: contact@ehi.com.mk

PARTNERET STRATEGJIKE


W3Schools


W3Schools


W3Schools


W3Schools

  • News
  • Technical Support
  • REFERENCE LIST
  • About Us
  • Contact
Copyright 2022 BP GROUP d.o.o. | All Rights Reserved
  • PRODUCTS
    • Production program 1
      • Swimming Pools and Pool Technique
      • Light Liquids Separators
      • Waterproof Collecting Tanks
      • Wastewater Treatment Plants
      • Tele-Supervising Control
      • UV Disinfection and Chemical Treatment
      • Composting
      • Polyelectrolyte preparation unit
    • Production program 2
      • Securing Devices
      • Drainage Channels
      • Manholes
      • Nidaplast
      • Rain Water Collecting Plants
      • Carwash Stations
    • Production program 3
      • Tanks
      • Pontoons
      • Pontoon house
      • Lagoons
      • Air Treatment
      • Treatment of Industrial Water
      • Filter Bags
  • PROJECTS
    • Treatment of Industrial Water
      • Fish industry – plant for processing sea fish
      • Dairy industry – milk processing plant
  • NEWS
  • TECHNICAL SUPPORT
    • QUUESTIONNAIRES
    • REFERENCE LIST
  • ABOUT US
  • CONTACT
  • Albanian
  • English
BP GROUP d.o.o.