{"id":8793,"date":"2015-08-02T01:24:31","date_gmt":"2015-08-02T01:24:31","guid":{"rendered":"https:\/\/bor-plastika.kliktronik.info\/wastewater-treatment-plants\/nacini-ugradnje\/"},"modified":"2015-08-08T08:44:42","modified_gmt":"2015-08-08T08:44:42","slug":"embedding","status":"publish","type":"page","link":"https:\/\/www.borplastikaeko.al\/en\/wastewater-treatment-plants\/embedding\/","title":{"rendered":"Embedding and Maintance"},"content":{"rendered":"<p>[vc_row][vc_column][vc_column_text]Instalation of the unit with double surface \u2013 type AB<\/p>\n<p>The pit must be excavated with corresponding ground dimensions and a concrete foundation board must be prepared (min. 20cm from the border of unit)<br \/>\nSettling of the separator consists of its placing on the flat concrete foundation board with an accuracy \u00b1 5 mm (min. 25 cm of thickness), connecting to inlet and outlet pipes, filling the water into the unit 30 cm high and back filling with concrete. Filling with water and filling back with the concrete must be carried out concurrently until top of the tank.<br \/>\nOn the top of the unit is necessary to concrete foundation board in accordance with the load.<\/p>\n<p>Instalation of the unit with one surface \u2013 type SN<\/p>\n<p>The pit must be excavated with corresponding ground dimensions and a concrete foundation board must be prepared (min. 40cm from the border of unit).<br \/>\nSettling of the separator consists of its placing on the flat concrete foundation board with an accuracy \u00b1 5 mm (min. 25 cm of thickness), connecting to inlet and outlet pipes, filling the water into the unit 30 cm high and back filling the soil works.<br \/>\nFilling with water and filling back the soil works must be carried out concurrently until top of the tank.<\/p>\n<p>Instalation of the unit with square cross section \u2013 type P (embedding to the grass area)<\/p>\n<p>The pit must be excavated with corresponding ground dimensions and a concrete foundation board must be prepared (min. 40cm from the border of unit).<br \/>\nSettling of the separator consists of its placing on the flat concrete foundation board with an accuracy \u00b1 5 mm (min. 25 cm of thickness), connecting to inlet and outlet pipes, filling the water into the unit 30 cm high and back filling the soil works.<br \/>\nFilling with water and filling back the soil works must be carried out concurrently until top of the tank.<\/p>\n<p>Instalation of the unit with square cross section \u2013 type P\u00a0(embedding in road way, high level of subsoil water)<br \/>\nThe pit must be excavated with corresponding ground dimensions and a concrete foundation board must be prepared (min. 20cm from the border of unit)<br \/>\nSettling of the separator consists of its placing on the flat concrete foundation board with an accuracy \u00b1 5 mm (min. 25 cm of thickness), connecting to inlet and outlet pipes, filling the water into the unit 30 cm high and back filling with concrete. Filling with water and filling back with the concrete must be carried out concurrently until top of the tank.<br \/>\nOn the top of the unit is necessary to concrete foundation board in accordance with the load.<\/p>\n<p>Maintenance of the WWTP<\/p>\n<p>Sludge is removed as necessary once the sludge storage spaces are filled up and as allowed by the possibilities of sludge removal and disposal. It is recommended that a specialised experienced company should be engaged and the sludge should be removed using a gully sucker. Removing of sludge is necessary 1-2 times a year or if the unit is not in service more then 3 months<br \/>\nImmediately after extracting the sludge, the WWTP must be refilled with water up to the original level. The WWTP is then put back into operation.<\/p>\n<p>Maintenance of the oil separators<\/p>\n<p>Visual function check is necessary 1-2 times a month.<br \/>\nThe operating staff checks the level of the water surface in all the parts of the separator, the condition of the sludge filters, the quantity of oil substances on a water surface.<br \/>\nThis operation can be also done together with a sludge removal carried out by a special authorized company.<br \/>\nThe liquidation of the removed oil substances must correspond with regulations concerning the waste liquidation. The oil substances have the character of a dangerous waste according to the law. Sorption filter is necessary to replace with new one.<br \/>\nImmediately after extracting the sludge, the separator must be refilled with water up to the original level.<\/p>\n<p>Maintenance of the grease separators<\/p>\n<p>Visual function check is necessary 1-2 times a month.<br \/>\nThe operating staff checks the level of the water surface in all the parts of the separator, the condition of the sludge filters, the quantity of oil substances on a water surface.<br \/>\nThis operation can be also done together with a sludge removal carried out by a special authorized company.<br \/>\nThe liquidation of the removed oil substances must correspond with regulations concerning the waste liquidation. The oil substances have the character of a dangerous waste according to the law.<\/p>\n<p>Immediately after extracting the sludge, the separator must be refilled with water up to the original level.[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text]Instalation of the unit with double surface \u2013 type AB The pit must be excavated with corresponding ground dimensions and a concrete foundation board must be prepared (min. 20cm from the border of unit) Settling of the separator consists of its placing on the flat concrete foundation board with an accuracy \u00b1 5 mm (min.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":8747,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v15.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.borplastikaeko.al\/en\/wastewater-treatment-plants\/embedding\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Embedding and Maintance - BP GROUP d.o.o.\" \/>\n<meta property=\"og:description\" content=\"[vc_row][vc_column][vc_column_text]Instalation of the unit with double surface \u2013 type AB The pit must be excavated with corresponding ground dimensions and a concrete foundation board must be prepared (min. 20cm from the border of unit) Settling of the separator consists of its placing on the flat concrete foundation board with an accuracy \u00b1 5 mm (min.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.borplastikaeko.al\/en\/wastewater-treatment-plants\/embedding\/\" \/>\n<meta property=\"og:site_name\" content=\"BP GROUP d.o.o.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/web.facebook.com\/borplastika\/\" \/>\n<meta property=\"article:modified_time\" content=\"2015-08-08T08:44:42+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\">\n\t<meta name=\"twitter:data1\" content=\"3 minutes\">\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.borplastikaeko.al\/en\/#organization\",\"name\":\"Borplastika Eko sh.p.k.\",\"url\":\"https:\/\/www.borplastikaeko.al\/en\/\",\"sameAs\":[\"https:\/\/web.facebook.com\/borplastika\/\"],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.borplastikaeko.al\/en\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/www.borplastikaeko.al\/wp-content\/uploads\/2022\/05\/BP-Group-web-logo.png\",\"width\":3393,\"height\":776,\"caption\":\"Borplastika Eko sh.p.k.\"},\"image\":{\"@id\":\"https:\/\/www.borplastikaeko.al\/en\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.borplastikaeko.al\/en\/#website\",\"url\":\"https:\/\/www.borplastikaeko.al\/en\/\",\"name\":\"BP GROUP d.o.o.\",\"description\":\"WASTEWATER TREATMENT PLANTS - FUTURE EXISTS\",\"publisher\":{\"@id\":\"https:\/\/www.borplastikaeko.al\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/www.borplastikaeko.al\/en\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.borplastikaeko.al\/en\/wastewater-treatment-plants\/embedding\/#webpage\",\"url\":\"https:\/\/www.borplastikaeko.al\/en\/wastewater-treatment-plants\/embedding\/\",\"name\":\"Embedding and Maintance - BP GROUP d.o.o.\",\"isPartOf\":{\"@id\":\"https:\/\/www.borplastikaeko.al\/en\/#website\"},\"datePublished\":\"2015-08-02T01:24:31+00:00\",\"dateModified\":\"2015-08-08T08:44:42+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.borplastikaeko.al\/en\/wastewater-treatment-plants\/embedding\/\"]}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","_links":{"self":[{"href":"https:\/\/www.borplastikaeko.al\/en\/wp-json\/wp\/v2\/pages\/8793"}],"collection":[{"href":"https:\/\/www.borplastikaeko.al\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.borplastikaeko.al\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.borplastikaeko.al\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.borplastikaeko.al\/en\/wp-json\/wp\/v2\/comments?post=8793"}],"version-history":[{"count":2,"href":"https:\/\/www.borplastikaeko.al\/en\/wp-json\/wp\/v2\/pages\/8793\/revisions"}],"predecessor-version":[{"id":8797,"href":"https:\/\/www.borplastikaeko.al\/en\/wp-json\/wp\/v2\/pages\/8793\/revisions\/8797"}],"up":[{"embeddable":true,"href":"https:\/\/www.borplastikaeko.al\/en\/wp-json\/wp\/v2\/pages\/8747"}],"wp:attachment":[{"href":"https:\/\/www.borplastikaeko.al\/en\/wp-json\/wp\/v2\/media?parent=8793"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}